Bridge approach raising by Slabjack Geotechnical

18557522522
1-855-752-2522

On of the problems with municipal roadways and bridges  is the settling of the concrete approach just prior to the bridge. The bridge itself is something that rarely settles due to the fact that the base typically goes to bedrock the approach however is normally just laid on compacted gravel and like any slab is susceptible to settling for a variety of reasons such as groundwater migration, erosion and a breakdown of organic layers beneath the concrete.

Slabjack Geotechnical is fully capable of handling these types of jobs. Depending on the size of the approach and the scope of work we can bring two or more complete operational rigs to quickly raise and stabilize bridge approaches, airport runways, loading bays and more.

For a no obligation estimate call today,

1-855-752-2522

www.SlabjackGeotechnical.com

Superior technology, Superior polymers, Superior results.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.