slabjack logo

Raise settled concrete.

The Great Leap Forward in concrete raising took place in 1983 when Geo-polymer Slabjacking was first introduced.

The material being injected as a liquid which quickly expands eliminated “pyramiding” of the material.

Pyramiding is when material goes in the opening of the concrete slab during the Slabjacking process and supports the slab in a pyramid shape.

Geo-polymers used in injection Slabjacking flow much better under the slab which provides a much larger force pushing up on the slab in comparison to pressure grouting. This better protects the slab from fractures and ensures superior coverage under the slab.

With pressure grouting the “recipe” needs to be followed to achieve duplicatable results, do you see measuring devices on their trucks? No.

With 1-855-752-2522s state of the art system the materials are computer controlled and measured, ensuring an exact, duplicatable end product that will be the same job to job, year after year.

Don’t fall for the pyramid scheme, call 1-855-752-2522 today,

1-855-752-2522

www.SlabjackGeotechnical.com

Superior technology, Superior polymers, Superior results.

 

Leave a Reply

Leave Us A Review Below:
Proud Member of:

CORPORATE OFFICE:

630 Valley Mall Parkway #431 East Wenatchee, WA 98802

Hours of Operation:

Monday – Friday: 8am-5pm

Saturday & Sunday: Closed

We have local branches serving Idaho and Washington.

Contractor License #SLABJG*833K2

Slabjack Geotechnical, 2024 © All Rights Reserved